The world needs a new source of energy, an unspillable source.

BP Gulf Oil Spill Disaster Cam 07-14-2010 11:49A Day 86 ROV Monitors New Capping Device

At the end of this clip you can see the new capping device sitting on the transition spool they installed above the flange on the low marine riser pack which is sitting on the damaged blowout preventer. Currently there are five places where oil can and or is coming out of. Two lines on the damaged BOP the choke and kill are where they have been recovering oil from other that the cap they where using before new one was placed on top. They will close these two lines down first and check pressure. More oil will gush out of the new capping device at the very top. Then they will close that down. Then the have two lines connected to the new capping device called choke and kill again. They will test presure and close the kill line off. Then the last choke line is variable by 18 turns by the ROV. They will monitor the well head pressure while closing this last valve 10% at a time. Once it is completely closed if the pressure stays high and stable they will have gained complete control of the well. It will have been shut off then. That time is coming very soon.
Video Rating: 3 / 5