A simple question, hopefully with a simple answer.
I need to generate 10,000,000kWh per year via wind and solar power.
With 8760 hours in the year, please presume 2500 full hours of good wind.
How many turbines do I need and of what rating? What is the most efficient set up?
At peak operation I need to generate a minimum of 370,000 kWh per month.
For the solar power I have 10,000 metre2 of available space.
The numbers may look big, but they are all correct, this is a serious question.
Thanks in advance.
If any of you work for a wind turbine/solar panel manufacturer/installer and want to discuss this, please email me your professional email address and I will contact you via that.